Rock Island District Public Notices

City of Perry, Iowa (CEMVR-RD-2020-610)

Rock Island District
Published May 16, 2022
Expiration date: 6/15/2022

The applicant proposes to expand the Perry Municipal Airport by the relocation and construction of Runway 14/32, 400 feet west, to a length of 4,000 feet and a width of 100 feet. Construction will occur in two phases. Phase 1 will also include a new airfield lighting system consisting of medium intensity runway edge lights, navigational aids, and an electrical vault building. Phase 2 will incorporate a 1,500- foot extension for a Runway 14/32 length of 5,500 feet and converting the existing runway to a full-length taxiway. As proposed Phase 2 will require closure and realignment of approximately ¾ mile of 150th Street south of the airport. Click the link below to view the full notice.