3/15/2024
The Village of Pontoosuc, IL is proposing construction to realign a new bridge androadway approaches over Spillman Creek. As part of the earthwork activities associated with the proposedbridge...
3/1/2024
This project will construct an earthen dam across an intermittent stream to create a sediment basin in effort to improve water quality by reducing sediment loads from entering Rathbun Lake...
2/6/2024
The Corps proposes to renew Regional Permit 7 for Linear Transportation Project and increase impacts from the previous impact threshold from 1-acre of waters of the U.S. (WUS) to 2.0-acres of WUS,...
2/6/2024
The bank sponsor proposes to complete the project in two phases on nearby pieces of property in Dubuque County, Iowa. Both phases of the project will entail the construction of Beaver Dam Analogs...
1/23/2024
The Iowa Department of Transportation (Iowa DOT) is proposing to make safetyimprovements to the existing intersection of US Highway 30 (US 30) and County Road R18/L Avenue (Co. Rd. R18/L Avenue), in...
1/11/2024
The bank sponsor proposes to complete activities on approximately 33 acres of privately owned property that would result in the establishment of wetland mitigation credits. The bank proposes to...
1/4/2024
The City of Cedar Rapids Seeks to improve public use areas and amenities in proximity to Cedar Lake. The current Cedar Lake Trail configuration requires cyclists to use Shaver Road. Due to the private...
12/12/2023
The applicant proposes to replace an existing 1,020-foot-long double track railroad bridge consisting of a multi-span Pratt deck truss style fixed metal bridge supported on concrete piers and...
12/12/2023
The applicant proposes to replace an existing 446-foot-long double track railroad bridge consisting of a 5-span Pratt deck truss style fixed metal bridge supported on concrete piers and timber piles...
12/5/2023
The Applicant proposes to widen and repave D Avenue from the Dallas/Greene County Line south to State Highway 141 near Dawson, Iowa. The project will involve widening the existing foreslope from 3:1...
12/5/2023
The Applicant has proposed to construct a new alignment of EP True Parkway between Wendover Lane to Grand Prairie Parkway for 1.2 miles...
11/16/2023
The bank sponsor proposes to perform stream restoration along reaches of a perennial stream (4,283ft) and two intermittent streams (1,094ft and 981ft) that flow into Honey Creek, then into the Iowa...
11/8/2023
The proposed project is located on Old Man’s Creek between Highland Street to Hampton Way in Section 10, Township 79 North, Range 10 West, Iowa County, Iowa. Lat. 41.6681, Lon. -92.0174. The Applicant...
10/2/2023
Project Location: The proposed site is located within Section 29, Township 27 North, Range 9 East, Stephenson County, Illinois.Bank Objectives: The fundamental objective of compensatory mitigation is...
9/14/2023
Project Location: The proposed project is located on West Indian Creek and a tributary to West Indian Creek in Section 7, Township 83 North, Range 22 West and Section 12, Township 83 North, Range 23...
9/14/2023
This notice is issued in accordance with the Compensatory Mitigation for Losses of Aquatic Resources; Final Rule (the Mitigation Rule) described in the Federal Register dated April 10, 2008 (33 CFR...
9/5/2023
THIS NOTICE IS AN INFORMATIONL NOTICE ONLY -- NO COMENTS ARE REQUESTED. The U.S. Army Corps of Engineers Districts within the State of Missouri (Kansas City, Little Rock, Memphis, Rock Island, St...
8/17/2023
The bank sponsor proposes to complete activities in one phase on 45.12-acres of property in Dallas County, Iowa. The creek occupies 2,982-linear feet and the proposed conceptual alignment would...
8/9/2023
The proposed project is located southeast of the existing Lake Springfield and north of Pawnee, Illinois in Section 31 of Rochester Township (see attached map). The proposed earthen dam is located on...
8/3/2023
Within Wapsipinicon State Park on the Wapsipinicon River in Section 11, Township 84 North, Range 4 West, Jones County, Iowa.The Iowa Department of Natural Resources proposes to install 20 weirs along...
7/31/2023
The proposed project is the final phase of the Southeast Connector (SEC) which will start at East Martin Luther King Boulevard and travel east to U.S. Highway 65. The project will cross Four Mile...
7/14/2023
The bank sponsor proposes to complete activities on approximately 78 acres of privately owned property that would result in the establishment of wetland mitigation credits. The bank sponsor proposes...
7/14/2023
The bank sponsor proposes to complete activities on 195.44-acres of property owned by the prospective bank manager (Brice Blair) and a private landowner. The proposed site is located approximately...
7/6/2023
The bank sponsor proposes to complete activities on approximately 79-acres of property owned by MADD, LLC. This project would result in the generation of emergent wetland, forested wetland, and stream...
7/6/2023
Effective August 01, 2023, the Corps of Engineers Regulatory Program areas of responsibility between the Rock Island District and Chicago District in Illinois will be changed. This change in...
7/5/2023
This project is the second phase of the overall Trails End Mitigation Bank project. The first phase of the project (Corps Project No. CEMVR-OD-P-20190433) included creation, restoration, and...
6/27/2023
The U.S. Army Corps of Engineers, Rock Island District, HAS REISSUED Regional General Permit 26 for work associated with emergency reconstruction and repair activities in all waters of the United...
6/26/2023
Project Location: The project is located on a 30-acre parcel on the south shore of Silver Lake to the northwest of the intersection of Beachcomber Drive and Highway 9, on both sides of the...
6/23/2023
The applicant proposes to demolish: the main building, and turbine hall associated outbuildings and structures, two cooling water intake screen houses (Screen House Nos.1 and 2), and the removal of...
6/23/2023
Project Location: The proposed site is located within Section 31, Township 79 North, Range 2 West, Cedar County, Iowa. Bank Objectives: The fundamental objective of compensatory mitigation is to...
6/14/2023
The U.S. Army Corps of Engineers, Rock Island District, HAS ISSUED GP-41, authorizing the protection and the repair of existing damaged structures, damaged land areas, and damaged fills that were...
5/9/2023
The applicant proposes to stabilize the bank of Rock Creek Lake by placing rock armoring along the shoreline at 57 locations for a total distance of18,510 linear feet. Most of the riprap is new and...
4/19/2023
The bank sponsor proposes to complete activities on 90 acres of publicly owned property that would result in the establishment of both stream and wetland mitigation credits. The goal of this project...
4/19/2023
The proposed project includes the removal and replacement of an existing railroad bridge across the Wapsipinicon River at Milepost 33.31 on the Clinton Subdivision. The proposed replacement bridge...
4/17/2023
In compliance with 33 USC 408 (Section 14 of the Rivers and Harbors Act of 1899; hereinafter Section 408), Economic Development Administration and Klingner & Associates PC request permission on behalf...
4/14/2023
REQUEST FOR COMMENTS FOR MISSOURI STREAM MITIGATION METHOD (MSMM) - The U.S. Army Corps of Engineers Districts within the State of Missouri (Kansas City, Little Rock, Memphis, Rock Island, St. Louis)...
4/5/2023
The Applicant has proposed to construct a new 22-acre impoundment for regional storm water management. The new pond will involve the excavation of 295,000 cubic yards of soil throughout the stream...
4/3/2023
This project consists of removing and replacing the structure (SN 009-0001) that spans over the Illinois River and Curry Lake as well as the reconstruction of the roadway approaches and the 6th...