The applicant proposes to install 20 concrete filled steel mooring pins at 400 foot intervals which will create an upper section of 4,400 feet and a lower section of 2,800 feet, for an approximate fleeting capacity of 106 barges, which would be arranged in varying configurations. Also, a 600 feet sheet pile dock wall will be constructed downstream, adjacent to the termination of the lower fleet. The barges will be fleeted/moored from mile marker 255.7 downstream to mile marker 254.1 (approximately 300 feet east of the Seneca Railroad Drawbridge).