The applicant is proposing to deploy an acoustic deterrent system. The placement of the acoustic deterrent system has been previously authorized under Nationwide Permit #5 on November 25, 2019. In order to access the location of the acoustic deterrent system, approximately 550 cubic yards of sediment will need to be dredged. The placement of the dredged material will be placed in an upland, non-wetland location, approximately .75 miles Northeast of the project area.