GP-34M authorizes the discharge of dredged and/or fill material related to mechanical sand and gravel excavation. Discharges authorized are limited to those which occur during the actual excavation process and those associated with preparation and restoration of the site. These discharge activities include, but are not limited to temporary stockpiling, access ramps, and construction of berms for siltation control.