Construction is planned in three increments:
Construction Increment I: (A) Automated Barge Clearing Deterrent, Leading Edge Bubble Deterrent, Leading Edge Acoustic Deterrent Array, Leading Edge Support Facilities, and Upstream Boat Launch (B) Site Prep, Channel Rock Excavation
Construction Increment II: Electric Deterrent, Wide Acoustic Deterrent Array, Complete Control Building, Right Descending Bank Wall Connect to Lower Guidewall, Flushing Lock, Downstream Boat Launch
Construction Increment III: Complete Engineered Channel
Non-structural measures, implemented in conjunction with other federal agencies, could include public education and outreach, monitoring, integrated pest management, manual or mechanical removal, and research and development.