Drawdown of Marseilles navigation pool delayed until May 11
The Corps of Engineers works to construct a rock dike just below Marseilles Dam. This dike will help reduce river flows and facilitate repairs to the dam.

Download Image: Full Size (0.17 MB)
Tags: Marseilles
Photo by: Aaron Dunlop |  VIRIN: 130507-A-OH748-001.JPG