130102-A-OH748-013
Routine maintenance dredging was conducted below Locks and Dam 15 in September by St. Paul District's Dredge Goetz, removing 10,000 cubic yards of dredge material just below the main lock chamber.

Download Image: Full Size (2.06 MB)
Photo by: Hilary Markin |  VIRIN: 130102-A-OH748-013.JPG