Rock Island District Public Notices

South River Industrial Levee Subdistrict (CEMVR-RD-2020-1454 & 408-MVR-2021-009)

Rock Island District
Published Nov. 18, 2021
Expiration date: 12/17/2021

The purpose of the project is bank stabilization. High water and flooding have caused continued bank erosion along the Mississippi River (MR) and South River (SR). Bank migration is encroaching on the SIRLS levee systems, mainly the MR levee and the SR levee. Continued migration could drastically impact levee stability and functionality.