This permit for the original project expired December 31, 2020. The Iowa Department of Transportation (IA DOT) is re-applying for the same permit for the purposes of obtaining a new permit that will allow them to complete the entire project. All of the impacts that were planned for in the original permit have been accounted for through the compensatory mitigation plan in the original permit. No additional mitigation will be required. The work described below was within the original permit, but it was not completed, and the IA DOT did not request an extension of time prior to the permit expiration.