The applicant is proposing approximately 15,700 linear feet of new and repaired bank stabilization to address the eroding shorelines around Lake Camelot (7,500 feet) and Lake Lancelot (8,200 feet). Stone and/or timber will be placed below the ordinary high water mark and up to 24 inches above full pool to stop the lateral erosion caused by wave action and reduce the sediment entering the lake body.