The purpose of the project is barge dock maintenance dredging. The permittee will perform maintenance dredging activities on the Illinois River. Approximately 25,000 cubic yards of material will be...
The applicant is proposing to dredge/excavate the existing Spring Bay Marina for the purpose of improving boat access. A temporary access path around the perimeter of the marina and a temporary...
The applicant is proposing a to construct a Clean Construction and Demolition Debris (CCDD) Facility within a former quarry along the Illinois River. CCDD facilities accept materials that are not...
The applicant is proposing to fill approximately two (2) acres of open water on the Mississippi River. This will be done by building a 650-foot-long sheet pile wall and backfilling from the wall to...
The applicant proposes to maintenance dredge the existing CF Industries, LLC (CFI) barge dock in Palmyra, Missouri...
The applicant proposes to maintenance dredge the existing CHS, Inc. barge dock in Peru, Illinois...
The applicant is proposing to impound 652 feet of intermittent stream. This will be done by moving the dam of a previously established pond which has silted in due to sedimentation. The dam will be...
The purpose of the project is barge mooring and fleeting. The proposed work consists of constructing concrete deadmen to moor barges from mile marker 253.2 to mile marker 253.7. The maximum number of...
The applicant proposes to perform mechanical dredging in the Illinois River, near the confluence of Farm Creek, and within their existing inlet structure...
The applicant proposes to perform hydraulic maintenance dredging in the Units 2/3 cooling water intake canal for the Dresden Nuclear Power Plant’s Units 2 & 3; located east of Morris, Illinois. The...
The applicant is proposing to fill and drain an existing 0.89-acre wetland and clear associated vegetation located at the Abraham Lincoln Capital Airport near the Charlie Ramp in order to minimize...
The applicant proposes to maintenance dredge the existing Koch Fertilizer barge dock in Henry, Illinois...
The applicant proposes to establish the Sangamon River Wetland and Stream Mitigation Bank to generate approximately 83 wetland credits and 17,857 stream credits, for use by the regulated public, to...
In accordance with Title 33 CFR 325.2 and 325.7(e), as published in the November 13, 1986, Federal Register, the U.S. Army Corps of Engineers, Rock Island District proposes to issue a regional general...
The applicant is proposing to place riprap bank stabilization along approximately 8,100 feet of eroding shoreline around Lake Evergreen. Stone will be placed near the shore from a barge to an...
The applicant proposes to install 20 concrete filled steel mooring pins at 400 foot intervals which will create an upper section of 4,400 feet and a lower section of 2,800 feet, for an approximate...
The applicant proposes to maintenance dredge the existing Woodland Shores Canal in Dixon, Illinois...
The applicant proposes to perform commercial dredging in an existing barge channel South of East Peoria, Illinois...
The applicant proposes to perform commercial dredging at an existing channel inlet West of Beardstown, Illinois...
The applicant is proposing approximately 15,700 linear feet of new and repaired bank stabilization to address the eroding shorelines around Lake Camelot (7,500 feet) and Lake Lancelot (8,200 feet)...
The applicant is proposing to place stone riprap along approximately 10,550 feet of eroding shoreline around Lake Bloomington. Stone will be placed near the shore from a barge to an elevation of 722.2...
The applicant proposes to perform commercial dredging at the existing, SABIC Innovative Plastics facility in Ottawa, Illinois...
The applicant is proposing a stream bank stabilization project on the north branch of Sugar Creek between College Avenue and Blair Drive. The north and west branches of Sugar Creek are areas...