The Major Rehabilitation and Major Maintenance Program for the Locks and Dams on the Mississippi River and Illinois Waterway has been ongoing since 1975. Major rehabilitation consists of reliability...
The project was authorized for construction in the Water Resources Reform and Development Act (WRRDA) of 2014. It provides protection along the east bank of the Cedar River. It includes earthen...
Coralville Lake is a multiple purpose project providing primary benefits in flood control and low-flow augmentation with secondary benefits in recreation, fish and wildlife management, forest...
The Des Moines Recreational River & Greenbelt is a partnership of local and federal governments and private interests dedicated to developing ecosystem improvements and recreational opportunities in...
The Dredged Material Management Program (DMMP) evaluates and identifies preferred alternative dredged material placement site(s) using a six-step planning process and, where applicable, a matrix with...
The Floodplain Management Services (FPMS) Program provides a full range of technical services and planning guidance in support of effective floodplain management and flood risk reduction...
In the Rock Island District, approximately forty thousand people live or work behind levees in the U.S. Army Corps of Engineers’ Levee Safety Program...
In order to maintain the 9-foot navigation channel, maintenance dredging is performed at various locations in the reach of the Upper Mississippi River in the Rock Island District...
Under authority of Public Law 84-99, during flood emergencies the Corps of Engineers may provide tribal, state and local communities with flood fight supplies and equipment...
The National Levee Database (NLD), developed by the U.S. Army Corps of Engineers (USACE), is the focal point for comprehensive information about our nation's levees...
Location:Upper Mississippi River, River Mile (RM) 301.2 near Saverton, Missouri, between Ralls County, Missouri, and Pike County, IllinoisDescription:The Navigation and Ecosystem Sustainability...
The Lock 25 – New 1200-foot Lock is the first of seven new 1200-foot Lock Projects being implemented under the Navigation and Ecosystem Sustainability Program (NESP)...
The Planning Assistance to States and Tribes (PAS&T) Program provides States, counties, local communities and Indian tribes with planning level assistance in addressing a water resources issues and...
In recent years, the Upper Mississippi River watershed has experienced more frequent flooding with higher stages, particularly in the last ten years with major floods occurring in 2008, 2010, 2011,...
Corps of Engineers policy regarding repairs to levee systems and flood control projects damaged by floods...
Saylorville Lake Project including the Big Creek Remedial Works is a multi-purpose project providing primary benefits in flood control and secondary benefits in low-flow augmentation, recreation,...
Water supply storage contract with the State of Iowa...
Section 1135 of the 1986 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to determine the need for project modifications in the structures and operations of...
LocationUnited StatesDescriptionSection 14, Emergency Streambank and Shoreline Protection program provides support for communities by constructing bank protection works to protect endangered highways,...
Section 204 of the 1992 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to restore, protect, and create aquatic and wetland habitats in connection with...
Section 205, small flood risk management program provides support for local flood risk management by the construction or improvement of structural or non-structural flood risk management measures...
Section 206 of the 1996 Water Resources Development Act, as amended, provides authority for the Secretary to carry out an aquatic ecosystem restoration and protection project...
The Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 USC 408 (commonly referred to as “Section 408”) authorizes the Secretary of the Army, on the recommendation of the Chief of...
In 1989, the Shoreline Management Plan (SMP) was developed and implemented as guidance for the management, protection and preservation of the Mississippi River's environment, while allowing a balanced...
The UMRR Program was authorized by the Water Resources Development Act (WRDA) of 1986 and continuously authorized by WRDA 1999. The program consists of two primary elements: habitat rehabilitation...
NESP is a long-term program of ecosystem restoration and navigation improvements for the Upper Mississippi River System (UMRS). NESP will improve system capacity and reduce commercial traffic delays...
The current Upper Mississippi River and Illinois River flow frequency study, completed in 2004, was created using a period of record ending in 1998. Since then frequent and record setting major floods...
Currently, there is no systemic flood risk management plan for the Upper Mississippi River. This uncoordinated flood response ultimately transfers risk to several areas, often without their knowledge...