The Major Rehabilitation and Major Maintenance Program for the Locks and Dams on the Mississippi River and Illinois Waterway has been ongoing since 1975. Major rehabilitation consists of reliability...
The project was authorized for construction in the Water Resources Reform and Development Act (WRRDA) of 2014. It provides protection along the east bank of the Cedar River. It includes earthen...
The city of Dubuque, Iowa, has two sanitary sewer mains, one thirty-inch and one forty-inch diameter, sanitary force mains and the Terminal Street lift station located adjacent to the Mississippi...
Coralville Lake is a multiple purpose project providing primary benefits in flood control and low-flow augmentation with secondary benefits in recreation, fish and wildlife management, forest...
The purposes of a dam safety program are to protect life, property and the environment by ensuring that all dams are designed, constructed, operated and maintained safely and effectively...
The City of Dubuque is requesting assistance with issues along the US Senator John C. Culver Floodwall at the Mississippi River in the City of Dubuque, IA...
The Rock Island District is prepared to provide all hazard response and recovery assistance under the authority of Public Law (PL) 84-99 and PL 93-288...
The Floodplain Management Services (FPMS) Program provides a full range of technical services and planning guidance in support of effective floodplain management and flood risk reduction...
The report outlines the District’s plan to maintain the Mississippi River 9-foot navigation channel by dredging material from the channel and placing it on a small island near the channel...
Over the last several years, the District has experienced significant flooding along the Des Moines and Iowa/Cedar rivers which resulted in levee overtopping, erosion, pump station damage and millions...
In the Rock Island District, approximately forty thousand people live or work behind levees in the U.S. Army Corps of Engineers’ Levee Safety Program...
The project consists of a 314-river-mile reach of 9-foot commercial navigation channel from Guttenberg, Iowa, downstream to Saverton, Missouri...
In order to maintain the 9-foot navigation channel, maintenance dredging is performed at various locations in the reach of the Upper Mississippi River in the Rock Island District...
Under authority of Public Law 84-99, during flood emergencies the Corps of Engineers may provide tribal, state and local communities with flood fight supplies and equipment...
The National Levee Database (NLD), developed by the U.S. Army Corps of Engineers (USACE), is the focal point for comprehensive information about our nation's levees...
The Planning Assistance to States and Tribes (PAS&T) Program provides States, counties, local communities and Indian tribes with planning level assistance in addressing a water resources issues and...
In recent years, the Upper Mississippi River watershed has experienced more frequent flooding with higher stages, particularly in the last ten years with major floods occurring in 2008, 2010, 2011,...
Corps of Engineers policy regarding repairs to levee systems and flood control projects damaged by floods...
Sabula Lakes is a backwater area of the Mississippi River that forms three lakes through and levee on the upstream end; a state highway embankment in the middle and a railroad embankment at the...
Section 1135 of the 1986 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to determine the need for project modifications in the structures and operations of...
Section 204 of the 1992 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to restore, protect, and create aquatic and wetland habitats in connection with...
Section 205, small flood risk management program provides support for local flood risk management by the construction or improvement of structural or non-structural flood risk management measures...
Section 206 of the 1996 Water Resources Development Act, as amended, provides authority for the Secretary to carry out an aquatic ecosystem restoration and protection project...
The Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 USC 408 (commonly referred to as “Section 408”) authorizes the Secretary of the Army, on the recommendation of the Chief of...
In 1989, the Shoreline Management Plan (SMP) was developed and implemented as guidance for the management, protection and preservation of the Mississippi River's environment, while allowing a balanced...
Beaver Island is located along the right descending bank of the UMRS in the southern portion of Clinton County, Iowa. Lock and Dam 13 is located 5 miles upstream of the island system. The Project...
The existing forest is degrading at an alarming rate with numerous stressed and dying trees. The ox-bow lakes have lost much of their depth due to sedimentation and provide little fish refuge in the...
The Pool 12 Forestry Habitat Rehabilitation and Enhancement Project (HREP) is located in portions of Jo Daviess County in Illinois, Dubuque and Jackson Counties in Iowa, and Grant County, WI. The...
NESP is a long-term program of ecosystem restoration and navigation improvements for the Upper Mississippi River System (UMRS). NESP will improve system capacity and reduce commercial traffic delays...
The current Upper Mississippi River and Illinois River flow frequency study, completed in 2004, was created using a period of record ending in 1998. Since then frequent and record setting major floods...
Currently, there is no systemic flood risk management plan for the Upper Mississippi River. This uncoordinated flood response ultimately transfers risk to several areas, often without their knowledge...