Rock Island District Header Image

ROCK ISLAND DISTRICT

Home

Project Information Papers

Dam Safety Program

ContactDam Safety Program Manager (309) 794-5246cemvr-ec@usace.army.milLocationRock Island District,
Published: 4/27/2017

Dredged Material Management Program (DMMP) - Overview

The Dredged Material Management Program (DMMP) evaluates and identifies preferred alternative dredged material placement site(s) using a six-step planning process and, where applicable, a matrix with six evaluation criteria: dredging cost; natural resources; beneficial use of dredged material; recreational resources; cultural resources; and social impacts.
Published: 9/28/2018

Floodplain Management Services (FPMS)

The Floodplain Management Services (FPMS) Program provides a full range of technical services and planning guidance in support of effective floodplain management and flood risk reduction.
Published: 4/27/2017

Levee Freeboard Forecasting GIS Tool - FPMS

Since 2008, the Rock Island District has produced freeboard estimates for levee systems along the Mississippi and Illinois Rivers.
Published: 5/1/2017

National Flood Fight Materiel Center - Overview

Under authority of Public Law 84-99, during flood emergencies the Corps of Engineers may provide tribal, state and local communities with flood fight supplies and equipment.
Published: 5/2/2017

Planning Assistance to States and Tribes

The Planning Assistance to States and Tribes (PAS&T) Program provides States, counties, local communities and Indian tribes with planning level assistance in addressing a water resources issues and planning needs.
Published: 5/2/2017

Regional Flood Risk Management

In recent years, the Upper Mississippi River watershed has experienced more frequent flooding with higher stages, particularly in the last ten years with major floods occurring in 2008, 2010, 2011, 2013 and 2014.
Published: 5/2/2017

Repairs to Levee Systems/Flood Control Projects - Policy

Corps of Engineers policy regarding repairs to levee systems and flood control projects damaged by floods.
Published: 5/3/2017

Section 1135 Projects (Project Modifications for Improvements to the Environment) - Overview

Section 1135 of the 1986 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to determine the need for project modifications in the structures and operations of existing Corps of Engineers projects for the purpose of improving the environment in the public interest.
Published: 5/3/2017

Section 204 Overview

Section 204 of the 1992 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to restore, protect, and create aquatic and wetland habitats in connection with construction or maintenance dredging of an authorized navigation project.
Published: 5/3/2017

Section 205 Overview

Section 205, small flood risk management program provides support for local flood risk management by the construction or improvement of structural or non-structural flood risk management measures.
Published: 5/3/2017

Section 206 Overview

Section 206 of the 1996 Water Resources Development Act, as amended, provides authority for the Secretary to carry out an aquatic ecosystem restoration and protection project.
Published: 5/3/2017

Section 408 Program

The Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 USC 408 (commonly referred to as “Section 408”) authorizes the Secretary of the Army, on the recommendation of the Chief of Engineers of the US Army Corps of Engineers (Corps), to grant permission for the alteration or occupation or use of a civil works project provided the Secretary determines that the activity will not be injurious to the public interest and will not impair the usefulness of the project.
Published: 5/3/2017

Upper Mississippi River Watershed Project

Contact Project Manager 309-794-5690LocationUpper Mississippi River BasinDescriptionThe Great Flood
Published: 5/4/2017