The U.S. Army Corps of Engineers has evaluated potential control options and technologies at Brandon Road Lock and Dam to prevent the upstream Interbasin transfer of Aquatic Nuisance Species (ANS)...
The project was authorized for construction in the Water Resources Reform and Development Act (WRRDA) of 2014. It provides protection along the east bank of the Cedar River. It includes earthen...
To maintain reliable navigation and avoid unscheduled long-duration closures on the Illinois Waterway (IWW), the locks need to undergo scheduled major rehabilitation and maintenance. Closure of five...
NESP is a long-term program of ecosystem restoration and navigation improvements for the Upper Mississippi River System (UMRS). NESP will improve system capacity and reduce commercial traffic delays...