Congressional District IL-11 Projects

Backlog of Maintenance
The Major Rehabilitation and Major Maintenance Program for the Locks and Dams on the Mississippi River and Illinois Waterway has been ongoing since 1975. Major rehabilitation consists of reliability...
Brandon Road Interbasin Project
The U.S. Army Corps of Engineers has evaluated potential control options and technologies at Brandon Road Lock and Dam to prevent the upstream Interbasin transfer of Aquatic Nuisance Species (ANS)...
Dam Safety Program
The purposes of a dam safety program are to protect life, property and the environment by ensuring that all dams are designed, constructed, operated and maintained safely and effectively...
Dredged Material Management Program (DMMP) - Overview
The Dredged Material Management Program (DMMP) evaluates and identifies preferred alternative dredged material placement site(s) using a six-step planning process and, where applicable, a matrix with...
Floodplain Management Services (FPMS)
The Floodplain Management Services (FPMS) Program provides a full range of technical services and planning guidance in support of effective floodplain management and flood risk reduction...
Illinois River Basin Restoration (sec 519,WRDA 2000)
Section 519 of WRDA 2000 authorized: (1) Comprehensive Plan to develop and implement a restoration program, long-term resource monitoring program, and evaluate new technologies and innovative...
Illinois Waterway
The project includes a total of 268 river miles of 9-foot commercial navigation channel from Chicago to LaGrange Lock and Dam, near Beardstown, Illinois; with 8 locks and 7 dams...
Illinois Waterway Dredged Material Management Plan (DMMP)
The Illinois Waterway Dredged Material Management Plan (DMMP), part of the Dredged Material Management Program, is a study to evaluate and identify dredged material placement sites to accommodate the...
Illinois Waterway Maintenance Dredging Operations & Maintenance
In order to maintain the 9-foot navigation channel, maintenance dredging is performed at various locations in the reach of the Illinois Waterway in the Rock Island District...
Levee Safety Program
In the Rock Island District, approximately forty thousand people live or work behind levees in the U.S. Army Corps of Engineers’ Levee Safety Program...
Lock 19 Acoustic Study
Invasive fish species, such as Bighead and Silver Carp, jeopardize aquatic ecosystems and affect the recreational uses of our nations’ waterways. The Invasive Carp Regional Coordinating Committee...
Mississippi River Maintenance Dredging (Operations & Maintenance)
In order to maintain the 9-foot navigation channel, maintenance dredging is performed at various locations in the reach of the Upper Mississippi River in the Rock Island District...
National Flood Fight Materiel Center - Overview
Under authority of Public Law 84-99, during flood emergencies the Corps of Engineers may provide tribal, state and local communities with flood fight supplies and equipment...
National Levee Database
The National Levee Database (NLD), developed by the U.S. Army Corps of Engineers (USACE), is the focal point for comprehensive information about our nation's levees...
Navigation and Ecosystem Sustainability Program (NESP) – Fish Passage - Lock and Dam 22
Location:Upper Mississippi River, River Mile (RM) 301.2 near Saverton, Missouri, between Ralls County, Missouri, and Pike County, IllinoisDescription:The Navigation and Ecosystem Sustainability...
Navigation and Ecosystem Sustainability Program (NESP) – Lock and Dam 25 New 1200-ft Lock
The Lock 25 – New 1200-foot Lock is the first of seven new 1200-foot Lock Projects being implemented under the Navigation and Ecosystem Sustainability Program (NESP)...
Planning Assistance to States and Tribes
The Planning Assistance to States and Tribes (PAS&T) Program provides States, counties, local communities and Indian tribes with planning level assistance in addressing a water resources issues and...
Regional Flood Risk Management
In recent years, the Upper Mississippi River watershed has experienced more frequent flooding with higher stages, particularly in the last ten years with major floods occurring in 2008, 2010, 2011,...
Repairs to Levee Systems/Flood Control Projects - Policy
Corps of Engineers policy regarding repairs to levee systems and flood control projects damaged by floods...
Section 1135 Projects (Project Modifications for Improvements to the Environment) - Overview
Section 1135 of the 1986 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to determine the need for project modifications in the structures and operations of...
Section 14 Overview
LocationUnited StatesDescriptionSection 14, Emergency Streambank and Shoreline Protection program provides support for communities by constructing bank protection works to protect endangered highways,...
Section 204 Overview
Section 204 of the 1992 Water Resources Development Act, as amended, provides authority for the Corps of Engineers to restore, protect, and create aquatic and wetland habitats in connection with...
Section 205 Overview
Section 205, small flood risk management program provides support for local flood risk management by the construction or improvement of structural or non-structural flood risk management measures...
Section 206 Overview
Section 206 of the 1996 Water Resources Development Act, as amended, provides authority for the Secretary to carry out an aquatic ecosystem restoration and protection project...
Section 408 Program
The Section 14 of the Rivers and Harbors Act of 1899 and codified in 33 USC 408 (commonly referred to as “Section 408”) authorizes the Secretary of the Army, on the recommendation of the Chief of...
Shoreline Management on Mississippi River
In 1989, the Shoreline Management Plan (SMP) was developed and implemented as guidance for the management, protection and preservation of the Mississippi River's environment, while allowing a balanced...
UMRR Program - IL, IA, MO, MN, WI - Upper Mississippi River Restoration
The UMRR Program was authorized by the Water Resources Development Act (WRDA) of 1986 and continuously authorized by WRDA 1999. The program consists of two primary elements: habitat rehabilitation...
Upper Mississippi River and Illinois River Flow Frequency Study
The current Upper Mississippi River and Illinois River flow frequency study, completed in 2004, was created using a period of record ending in 1998. Since then frequent and record setting major floods...
Upper Mississippi River Watershed Project
Currently, there is no systemic flood risk management plan for the Upper Mississippi River. This uncoordinated flood response ultimately transfers risk to several areas, often without their knowledge...